3
So far so good. There are minor problems of bending febar. The finishes we have convinced ms. Nani to go for PU Coating. Which means it will remained RAW.
Everything is going smooth.The only problem we are facing now is M-0-n-3-Y
Read more
Status & Progress- ORIGAMI BENCH
Posted by
贤德
Labels:
origami
So far so good. There are minor problems of bending febar. The finishes we have convinced ms. Nani to go for PU Coating. Which means it will remained RAW.
Everything is going smooth.The only problem we are facing now is M-0-n-3-Y
0
Status & Progress Update 01
Posted by
Shyn Cheah
Labels:
Curi Tulang
Status and progress update from group Curi Tulang (so everyone else is in the know):
They have put down the deposit to manufacture their carpet, but yet for their steel parts. They are managing the carpet deposit of RM1300 by themselves, but will dip into the "trust fund" that Chian and I have set-up for RM750 deposit for the steel components (this is tentative to discussion among the other four approved groups, of course.)
Both main components of the design are scheduled for completion of manufacturing and thus transport on the 18th of November. Once on-site, the group will take three days assembling their piece meaning that the official completion date for Curi Tulang falls on November 20.
Minor issues they have encountered in the last few days include a minor change to the cost of manufacturing (but due to their soft skills, they have managed to waiver the cost of transportation) thus bringing their total cost to RM3750 as opposed to RM3222 before.
Well done guys!
Ps. did I miss anything out? Do share/correct!
Read more
They have put down the deposit to manufacture their carpet, but yet for their steel parts. They are managing the carpet deposit of RM1300 by themselves, but will dip into the "trust fund" that Chian and I have set-up for RM750 deposit for the steel components (this is tentative to discussion among the other four approved groups, of course.)
Both main components of the design are scheduled for completion of manufacturing and thus transport on the 18th of November. Once on-site, the group will take three days assembling their piece meaning that the official completion date for Curi Tulang falls on November 20.
Minor issues they have encountered in the last few days include a minor change to the cost of manufacturing (but due to their soft skills, they have managed to waiver the cost of transportation) thus bringing their total cost to RM3750 as opposed to RM3222 before.
Well done guys!
Ps. did I miss anything out? Do share/correct!
0
Just incase you were wondering what the client's tastes are like and has in mind.
They are pretty high end stuff so make sure you are sharp in these critical moments.
Also, a reminder, Jo-Lene is available this week for consultation. Please take advantage of that.
Read more
Client Mood Boards
Posted by
sA | Chian Quah
Just incase you were wondering what the client's tastes are like and has in mind.
They are pretty high end stuff so make sure you are sharp in these critical moments.
Also, a reminder, Jo-Lene is available this week for consultation. Please take advantage of that.
2
Latest Updates /// Client Reactions 02
Posted by
sA | Chian Quah
Labels:
|
In lieu of client requirements and concerns towards submission date, here are some updates.
- Conteng /// Client has decided to build your piece. Just ensure you obtain the paint by next week.
- Loft /// Need updates from your group. Clients excited with their first ever carpet piece. Looking for more. Volunteers?
- Visual Phenomenon /// Still awaiting your group's conviction on whether this is good to go? Pamela/Kartigha, Are you both still interested in this? We have agreed to split ShiQi up from the group for the following weeks. Sort this out by Friday please.
- Ben[t]ch /// Updates please on how far you have gone, no more costing; How long will this take to build? [Friday]
-------------------------------------------------------------------------------------
Refinements Required and Resubmission ready by Thursday.
- Origami /// Client mentioned their concern on the piece being too sharp edged.
You need to prove it is seat-able. Suggest you test this heavily with Anthropometric drawings. Test 1:1 edges and document them. Will revert to client on this by Friday, so please have these ready ASAP.
- Famine /// Refinements (please remember the client's comments! )I think we all need to realise these chairs need a level of comfort too! Resubmission by this Friday.
-------------------------------------------------------------------------------------
Design revision and Resubmission by Thursday.
- Growth /// Resubmit Full Design Proposition. Ensure Communal siting strategy and buildablility is preserved. Could a a big piece made up of a few smaller vertically variant boxes.
- Pandora Box /// As discussed, submit all design propositions, will let client have a choide.
- In-Ex /// Resubmit plywood variant. Full scale understanding of materials and potential of 'poetry' in some form required on surfaces.
-------------------------------------------------------------------------------------
Prototyping and 1:1 Submission by Friday
- Slant /// Ensure you build 1 part of the 6 by Friday. Will submit outcome to client.
- Plastic Bench /// Needs to pull of a miracle. Am completely nervous and worried for your group, we need to see something and critically a small part of your bench this Friday or we might have to pull the plug on your proposal. You will be required then to build a replica bench.
All teams are encouraged to prototype key junctions, difficult challenging details before construction.
Read more
- Conteng /// Client has decided to build your piece. Just ensure you obtain the paint by next week.
- Loft /// Need updates from your group. Clients excited with their first ever carpet piece. Looking for more. Volunteers?
- Visual Phenomenon /// Still awaiting your group's conviction on whether this is good to go? Pamela/Kartigha, Are you both still interested in this? We have agreed to split ShiQi up from the group for the following weeks. Sort this out by Friday please.
- Ben[t]ch /// Updates please on how far you have gone, no more costing; How long will this take to build? [Friday]
-------------------------------------------------------------------------------------
Refinements Required and Resubmission ready by Thursday.
- Origami /// Client mentioned their concern on the piece being too sharp edged.
You need to prove it is seat-able. Suggest you test this heavily with Anthropometric drawings. Test 1:1 edges and document them. Will revert to client on this by Friday, so please have these ready ASAP.
- Famine /// Refinements (please remember the client's comments! )I think we all need to realise these chairs need a level of comfort too! Resubmission by this Friday.
-------------------------------------------------------------------------------------
Design revision and Resubmission by Thursday.
- Growth /// Resubmit Full Design Proposition. Ensure Communal siting strategy and buildablility is preserved. Could a a big piece made up of a few smaller vertically variant boxes.
- Pandora Box /// As discussed, submit all design propositions, will let client have a choide.
- In-Ex /// Resubmit plywood variant. Full scale understanding of materials and potential of 'poetry' in some form required on surfaces.
-------------------------------------------------------------------------------------
Prototyping and 1:1 Submission by Friday
- Slant /// Ensure you build 1 part of the 6 by Friday. Will submit outcome to client.
- Plastic Bench /// Needs to pull of a miracle. Am completely nervous and worried for your group, we need to see something and critically a small part of your bench this Friday or we might have to pull the plug on your proposal. You will be required then to build a replica bench.
All teams are encouraged to prototype key junctions, difficult challenging details before construction.
Subscribe to:
Posts (Atom)
Powered by Blogger.
Popular Posts
-
I AM SURE IT WILL BE GETTING SOME SERIOUS TRAFFIC SOON. I nominate Origami group, they are done & freeeee, if you guys want an A+, this ...
-
The box is almost finish, we are changing the material since the carpenter said he need a slightly thicker timber for the hinges. Rehan has...
-
Dear Benchmakers, We believe in self development. Even to the core. For this final assessment, we want your feedback on yourselves. A reflec...
-
In lieu of client requirements and concerns towards submission date, here are some updates. - Conteng /// Client has decided to build your ...
-
No offense but I think you guys are over-complicating what is potentially a very simple scheme (and because you are over-doing it, even the ...
-
Further elaboration of the concept: T he bench is the 1st step for the public to get kick start to the complicated story behind the crane n ...
-
Update on In-Ex by Joe, Bikram and Harshil Growth by Chin Siang, Joon Hong and Feridson Both our groups(timber groups), 'In-Ex' a...